The historic wooden bridge in Wünschendorf on White Elster
- Written by Portal Editor
Our friend Jörg invited us to a caravan or trailer meeting for bicycles (we will report later) in Gera for the first time in Germany and probably also around the world, a region that we had hardly explored so far.
So we came across the country, avoiding the highways, to Gera-Wünschensdorf, where we first had to cross the Elster and this over a single-lane, roofed wooden bridge, which is one of the last remaining roofed wooden bridges in Germany. The bridge is now a listed building and we remembered a comparable bridge construction in Cheb in the Czech Republic. The Wünschendorf bridge was first built in the 13th century and has since been destroyed several times. Today's bridge was built in 1786.
On to the covered wooden bridge of Wünschensdorf
The first information about the bridge was quickly found on site, the bridge is 71 meters long and 4.30 meters wide, which allows one-sided driving. Apart from the brick foundations, the entire bridge is made of wood and covered with shingles. It rests on 40 to 50 cm thick wooden beams that were cut in the Weidaer Staatsforst. Architecturally, the bridge is one of the covered wooden bridges. The construction is similar to that of the Hohenfichte wooden bridge, which dates from 1832.
On the history of the wooden bridge in Wünschensdorf
The bridge was not completely renovated until 998. It is still open to traffic today, albeit with severe restrictions: Height restriction: 2.10 m, weight restriction: 2,000 kg and top speed: 10 km / h.
In 2007 it was voted the most beautiful bridge in Central Germany by the viewers of the MDR, in front of the Göltzschtalbrücke and the Krämerbrücke in Erfurt.
Today's traffic and operating situation
A spacious bypass of Wünschendorf was planned to relieve the old wooden bridge. However, a first related planning approval procedure failed in spring 2008. The construction of a bridge to relieve the historical wooden bridge parallel to it also failed due to a lack of will and the necessary money and will probably have been put on record forever.
The bridge has been rebuilt since July 2013 and was reopened to traffic in September 2014. It now has a steel and concrete substructure. The passability was maintained with restrictions for vehicles up to 7.5 t, as the clearance height is limited to only 2.10 m.
Absolutely worth seeing!
Please read as well:
Cheb in Czech Republic - Covered bridge crossing Eger
A detour with consequences - Passage of the Lake Dojran